I'm happy to just have the car running at this point. I havent even thought about the rack for a few months. I'll probably get a spare shell before I get into it again. Got any spare shells laying around?
Getting the engine bolted in is about 10% of the way there.
The next 80% can go quickly with help and skill.
That last 10% takes about as long as the 90% that came before it.
i have decided to use a magna rack and cut it down 190mm. i went magna coz its big and heavy, thus it has a very strong rack / balljoints / tierods. most of it is done i just need to make mounts for it and some uni's... 2 weeks i hope and it will be done.. pics then.
photos please! Where do you get a Magna rack anyways?
Getting the engine bolted in is about 10% of the way there.
The next 80% can go quickly with help and skill.
That last 10% takes about as long as the 90% that came before it.
oh yeah.. forgot where you were from. still.. photos please
Getting the engine bolted in is about 10% of the way there.
The next 80% can go quickly with help and skill.
That last 10% takes about as long as the 90% that came before it.